P4 Verification: Draft Technical Design Brief
Status: COMPLETED
Overview
P4 involved writing a comprehensive technical design brief that provides implementation-ready specifications for Milestone 2.
Verification Criteria
- Problem statement with clear analysis
- Scope definition with M2 targets and non-goals
- Architecture overview with technical details
- Detailed design specifications
- Implementation roadmap and acceptance criteria
Implementation Status
Problem Statement
- Current State: Clear analysis of why local EVMs fail for Arbitrum features
- Root Causes: Precompile registry, transaction type support, gas model mismatch
- Impact Assessment: Development cycle impacts quantified
Scope Definition (M2 Target)
- Core Features: ArbSys and ArbGasInfo emulators, 0x7e transaction support
- Packaging: Hardhat plugin and Anvil extension specifications
- Non-Goals: Clear boundaries for M2 (retryables, Stylus, APGAS out of scope)
Architecture Overview
- Precompile Registry: Address→handler mapping system
- Handler Interface: Complete TypeScript interfaces with context handling
- 0x7e Integration: Hardhat and Anvil integration points specified
- Configuration: Chain ID overrides, fee mocks, CLI flags
Detailed Design
- ArbSys Emulator: Supported functions, return value sources, error semantics
- ArbGasInfo Emulator: Read-only functions, mock L1 cost strategy
- Transaction Type 0x7e: Envelope fields, execution model, gas accounting
- Error Handling: Developer UX strategy with actionable guidance
- Testing Strategy: Unit tests, golden tests vs Arbitrum One
Evidence Files
docs/m1-design-brief.md- Lines 1-551: Complete technical design brief- All required sections present and comprehensive
- Code examples in TypeScript and Rust provided
Test Results
Status: COMPLETED
- Design brief covers all required sections
- Implementation specifications are clear and actionable
- Architecture decisions are well-documented
Issues Found
None - P4 implementation is comprehensive and implementation-ready
Verification Result
P4: COMPLETED - Complete technical design brief ready for M2 implementation