P3 Verification: Build Compatibility Matrix
Status: COMPLETED
Overview
P3 involved building a comprehensive compatibility matrix with evidence from probe results and detailed implementation guidance.
Verification Criteria
- Markdown compatibility matrix created
- CSV compatibility matrix created
- Evidence from probe results included
- Implementation guidance provided
- Priority-based feature categorization
Implementation Status
Compatibility Matrix Structure
File: docs/compatibility-matrix.md
- Feature Categories: ArbSys, ArbGasInfo, Deposit_Transaction
- Support Levels: Not Supported, Partial, Supported
- Evidence: Specific probe results and error messages
- Proposed Fixes: Implementation strategies for each feature
- Priority Levels: P0, P1, P2 categorization
CSV Format Matrix
File: docs/compatibility-matrix.csv
- Machine-readable format for analysis
- Detailed method-by-method compatibility status
- Implementation notes and complexity assessments
- Priority assignments for development planning
Evidence Integration
- Hardhat Probe Results: CALL_EXCEPTION errors with empty data
- Foundry Probe Results: Expected failures logged properly
- 0x7e Transaction Results: Unexpected success in Hardhat (partial support)
- Error Details: Specific error messages and failure modes
Implementation Guidance
- Proposed Fixes: Emulate, decode, config strategies
- Priority Matrix: P0 (Critical), P1 (Important), P2 (Optional)
- Technical Approach: Hardhat plugin vs Foundry extension
- Configuration: Chain ID, fee models, feature flags
Evidence Files
docs/compatibility-matrix.md- Lines 1-156: Comprehensive analysisdocs/compatibility-matrix.csv- Lines 1-27: Machine-readable format- Probe results integrated with matrix findings
Test Results
Status: COMPLETED
- Matrix covers all target Arbitrum features
- Evidence properly documented from probe testing
- Implementation guidance clear and actionable
Issues Found
None - P3 implementation is comprehensive and evidence-based
Verification Result
P3: COMPLETED - Complete compatibility matrix with evidence and implementation guidance